
Part of SKULKESKOLEN, 2–6 September 2026Ase Brunborg Lie invites participants to join an energy infrastructure hike at Burkelandsfjellet.Through walking, silent listening, sensing, mapping and narration, the group will trace the planned route of the Samnanger power distribution line, where 420kV power towers up to 120 metres high — the so-called monstermaster — are proposed to be installed. Intended to supply power to Øygarden and offshore industrial sites such as the Troll oil field, the project has become a focal point for questions of energy transition, land use and ecological preservation.Traversing mountains, sheep pasture, farmland, protected forest, and residential landscapes, the wal